Week 6 finds me back home and ready to work.
We ordered a trash bin, scheduled quotes for HVAC systems for the house and mobile, glass quotes to repair broken windows in mobile and had our internet moved up to the mobile while the power is down to the main house. Shane continued to work on the mobile home.
He repaired the flooring under the water tank, ran the plumbing for the water tank and did all the plumbing under the mobile.

I got busy loading the trash bin as soon as it came.

I made a dent in the pile, but we are going to need another bin.
Meanwhile, Shane got the shower surround framing done with a shower nook, moisture barrier and backerboard up for the tub, and the drain working.

The power line was taken down, ready to be moved under ground and the cable line was taken down and moved under ground, so we are ready for the garage installation.

We wrapped up the week meeting with the architect and making some changes to the floor plan of the house and picking out paint and tile for the mobile home.